Harmsen completed work for the reconstruction of Hill Street for the City of Monroe. The scope of services included the preparation of plans, specifications, and estimates for the reconstruction of Hill Street from Kelsey Street to Madison Street. 

This section of Hill Street was 900 feet long and 38-feet wide from curb to curb with single-family residential housing on the North side of the street and Monroe Middle School on the South. 

Our work included

  • Pavement reconstruction that reduced the crown of Hill Street
  • Curb and gutter replacement to match pavement reconstruction
  • Sidewalk work to make complete sidewalks on both sides of Hill Street
  • Redesign of pavement at intersection of Orr Street and Hill Street that eliminated existing drainpipe under Orr Street
  • Storm drainage system redesign to disconnect all storm main connections from the sanitary sewer mains 
  • Replacement of water, sewer, and drainage mains
  • Replacement of water services up to and including meter setters and boxes
  • Right-of-way research and acquisition support for takes along the North side of Hill Street

Note: This project has not yet been constructed 

Services Provided

  • Civil Engineering
  • Surveying
Gallery: Hill Street
Hill & Madison Intersection
Hill & Madison Intersection

Alternate intersection detailing

Hill Street - West
Hill Street - West

View of Hill Street looking West (Middle School to South).

Hill Street - East
Hill Street - East

View looking East.

Hill Street Catch Basin
Hill Street Catch Basin

Existing outdated catch basin.

Hill Street Construction Plan
Hill Street Construction Plan

Construction phasing plan.